Banbang Hydropower Station

Banbang Hydropower Station

Banbang Hydropower Station is the eighth stage of the cascade development of the main stream of the Xiangjiang River. The installed capacity of the station is 48MW. It was connected to the grid in August 2007 with a total investment of 480 million yuan.